These charts were used in the reverse direction for the purpose of this analysis. Instead of computing an allowable slab thickness for a target wheel load, the allowable wheel load for a given slab thickness and subgrade modulus needed to be calculated. The calculation is tricky as the process now becomes non-linear.

In United State concrete measured in cubic yard, there are several sizes of RMC truck on road. Most common concrete truck has drum capacity of 11 to 15 cubic yards, however due to weight limit on the road they can carry 8 to 11 cubic yard of concrete. The size of the concrete truck will determine how long it will stay on site. Depending on the size of the job, an eight to ten-yard truck can pour driveways, patios, and footings.

There could be other fees for such things as Saturday concrete truck delivery and small loads. Ask about these fees so you know the total bill before the concrete truck arrives. The cost per cubic yard is calculated by multiplying the overall square footage by the depth of the concrete. For example, a ten-foot-by-10-foot area with a six-inch depth equals 100 square feet.

In a perfect universe, our 1,080 square foot driveway will need exactly 16.62 cubic yards of concrete (1,080 square feet / 65 square feet equals 16.62 cubic yards). A truck carrying concrete weighs about forty thousand pounds. A 10 yard load can be as high as the roof of a standard pickup truck.

There is an average of 8-10 yards of concrete in a truck. Large trucks can hold upwards of 14 cubic yards, while mini truck carry around 4. The cost of a yard of concrete varies depending on the type and size of your project. study group names A common way to calculate this cost is by multiplying the total square footage by the depth of the concrete. For example, a ten-foot-by-10-foot-area with a six-inch depth would require 50 cubic feet of concrete.

The average cost of concrete nationwide is $125 per cubic yard, with most concrete companies chargingbetween $110 and $165 per cubic yard. The majority of homeowners spend no less than $550 total on smaller projects and up to $17,000 total on larger concrete projects. Pouring your own concrete is cheaper than hiring a professional. It will take you much less time and money than hiring a professional. However, you will need to know how to use the proper ratio of cement to water. While there is room for variance, most full-size dump trucks have a capacity of between 10 and 16 cubic yards.

But to answer the question of, “How long does concrete take to set? At this point the neighborhood dog will not leave his footprints in it, but you should keep it clear of heavy equipment during this time period. Measure the width of the truck bed, from the inside of one wall to the other. Write down this number in feet to make the calculations simpler.

Concrete PricesPer YardPer Square FootPer Truck LoadPer TonHow Much Concrete Do You Need? When you finish, concrete must be cleaned off immediately. Wash the truck, tools, and wheelbarrows in an area where the water will not run off into the garden or other areas. Cure the concrete by adding a cure-and-seal compound to your mixture to limit cracking. Before the concrete sets, you can add decorative finishing such as patterns or textures.